- Remote
- Hybrid
- On-site
- Full-time
- Contract
- Project Management
... stage of execution and report the same to concern the project / site manager. - Ensure the results of SAT as per our internal protocols and cross check with factory routine tests (FRT) and factory acceptance test (FAT) in case if required. - Prepare and send the site corrected/red marked drawings to engineering department ...
Chennai, भारत